Today I mostly .....
I Have a special tool for doing mine on my own its a bit of 3 by 2 plank jammed on the brake by the seat works just the job lolhoverfrog wrote:... played with Nivas(it's been raining all day)
The RHD 1600 has a new master cylinder and servo, and is now ready for bleeding the brakes when some unsuspecting visitor arrives (my ezibleed kit hasn't got the right size cap)
My old lada i found it in was an ex- KGB car maybe they had other uses for this tool lol ..its about 2 foot long ish ive always got realy good brakes with it ....i start with the compensator above the back axle then back left, back right,front left,front right ...with the engine running ..still easier if you find some lost soul with a spare foot to stand on it thohoverfrog wrote:do you have that copyrighted or can I have the dimensions???mooshaker wrote:I Have a special tool for doing mine on my own its a bit of 3 by 2 plank jammed on the brake by the seat works just the job lolhoverfrog wrote:... played with Nivas(it's been raining all day)
The RHD 1600 has a new master cylinder and servo, and is now ready for bleeding the brakes when some unsuspecting visitor arrives (my ezibleed kit hasn't got the right size cap)
-
Lada & Korean Parts
- Platinum

- Posts: 1652
- Joined: Tue Apr 24, 2007 3:32 am
- Location: CABOOLTURE, SUNNY QUEENSLAND, AUSTRALIA
- Contact:
moved into new house-----what a bloody job after being in the one place for 18 years.......
PARTS SUPPLIED FOR:
Lada,Ssangyong,Daewoo,Hyundai,Kia,Festiva Rocsta
www.ladaparts.com or andrew@ladaparts.com
Lada,Ssangyong,Daewoo,Hyundai,Kia,Festiva Rocsta
www.ladaparts.com or andrew@ladaparts.com
2 and half months at main dealer rates is about the same income as a small island!mooshaker wrote:collected my jazz after honda took 2 and a half months to do a clutch ..shocking
What are they doing making in house out of a rare material ?
Regards.
John 2E0DHN
Holly: This is not a daffodil, repeat, this is not a daffodil!
John 2E0DHN
Holly: This is not a daffodil, repeat, this is not a daffodil!
it was done at the factory (circus) i realy have no idea why a half hour job took so long ..think the old one was made from blotting paper it only lasted 9000 miles well 30 miles of snow killed it lolexcossack wrote:2 and half months at main dealer rates is about the same income as a small island!mooshaker wrote:collected my jazz after honda took 2 and a half months to do a clutch ..shocking
What are they doing making in house out of a rare material ?
I thought Toyota had an issues with brakes not clutches!
Today i popped in to see a mate on the way home and hes got himself a 650cc flat twin prop drive motorbike..
Its not a BMW bike as such.... and its got a side car as well!
Today i popped in to see a mate on the way home and hes got himself a 650cc flat twin prop drive motorbike..
Its not a BMW bike as such.... and its got a side car as well!
Regards.
John 2E0DHN
Holly: This is not a daffodil, repeat, this is not a daffodil!
John 2E0DHN
Holly: This is not a daffodil, repeat, this is not a daffodil!
It looks like
http://cgi.ebay.co.uk/Dnepr-Neval-mt11- ... 35a7d635d2
http://cgi.ebay.co.uk/Dnepr-Neval-mt11- ... 35a7d635d2
Regards.
John 2E0DHN
Holly: This is not a daffodil, repeat, this is not a daffodil!
John 2E0DHN
Holly: This is not a daffodil, repeat, this is not a daffodil!



